[1]
NORDESJÖ L.-O., “Estimation of the Maximal Work Rate Sustainable for 6 Minutes Using a Single-level Load or Stepwise Increasing Loads”, ujms, vol. 79, no. 1, pp. 45-50, Mar. 1974.