1.
NORDESJĂ– L-O. Estimation of the Maximal Work Rate Sustainable for 6 Minutes Using a Single-level Load or Stepwise Increasing Loads. ujms [Internet]. 1974Mar.1 [cited 2024Apr.19];79(1):45-50. Available from: https://ujms.net/index.php/ujms/article/view/7417